AdditionMayToJuly2015


2015May5 Footings
2015May5 Footings
2015May5 FootingsFront
2015May5 FootingsFront
With concrete walls
With concrete walls
Corner Lolly column to be removed
Corner Lolly column to be removed
Slab next above insulation
Slab next above insulation
close-up of wall cut-out for door
close-up of wall cut-out for door
Toward lake
Toward lake
Seeded area
Seeded area
Lakeside deck cut for workbench
Lakeside deck cut for workbench
Lumber for walls
Lumber for walls
rubber roof installed
rubber roof installed
rubber roof at door from porch
rubber roof at door from porch
rubber roof at french doors
rubber roof at french doors
rubber roof
rubber roof
north wall framing
north wall framing
north wall
north wall
NW corner framing
NW corner framing
west wall framing
west wall framing
ceiling fixture
ceiling fixture
bay window installed
bay window installed
north wall exterios
north wall exterios
Door detail before door install
Door detail before door install
Deck installed; new floor level
Deck installed; new floor level
new decking atop rubber roof anf 2x4s
new decking atop rubber roof anf 2x4s
interior before carpet
interior before carpet
interior looking SE
interior looking SE
interior looking west
interior looking west
interior looking north
interior looking north
interior SE corner
interior SE corner
interior NE corner
interior NE corner
before steps
before steps
before steps NE corner
before steps NE corner
From lakeside
From lakeside
Looking east
Looking east
Removed lakeside deck
Removed lakeside deck
To be filled with loam and erosion-control mulch
To be filled with loam and erosion-control mulch
Interior completed
Interior completed
Interior with Fitzgerald chest looking NW
Interior with Fitzgerald chest looking NW
Interior looking west
Interior looking west